Project Overview
The Phase I-A/I-B US 62/US 285 Study, also known as the Carlsbad "Y" Phase I-A/I-B Study, is underway to examine existing conditions and potential alternatives at the interchange of US 62 and US 285 in Carlsbad, NM. It is programmed in the NMDOT Statewide Transportation Improvement Program (STIP) under Control Number (CN) 2106010.
The purpose of the study is to identify and recommend alternatives that will improve safety and connectivity for all user types of the transportation system. A combination of multimodal users, strong heavy vehicle presence, and business and driveway access points along the corridors have led to both safety and congestion issues.


Study Area

Study Process and Timeline
The Carlsbad “Y” Phase I-A/I-B Study follows the NMDOT Location Study Procedures which are showcased below:

Ultimately, the Study Process aims to:
-
Study issues in the area (safety, access, etc.)
-
Identify a purpose and need for project
-
Develop initial alternatives to address purpose and need
-
Engage stakeholders and the public
-
Create screening matrix and evaluate alternatives
-
Perform detailed engineering analysis and screening

Engagement Opportunities
Check back regularly and sign up for project updates to find the latest ways to get involved!

Coming Soon
Check back soon for additional details!

Coming Soon
Check back soon for additional details!

Coming Soon
Check back soon for additional details!
Previous Planning Efforts

Check back for proposed alternatives soon!
Proposed Alternatives

Contact Us
If you would like to get in touch with the study team or sign up for project updates, email us at Carlsbad-Y@bhinc.com or fill out the form below!
Study Team
Agency Team





Consultant Team