Carlsbad “Y” Phase I-A/I-B Study CN 2106010

US 62-285 Phase A-B Study Logo

Project Overview

The Phase I-A/I-B US 62/US 285 Study, also known as the Carlsbad "Y" Phase I-A/I-B Study, is underway to examine existing conditions and potential alternatives at the interchange of US 62 and US 285 in Carlsbad, NM. It is programmed in the NMDOT Statewide Transportation Improvement Program (STIP) under Control Number (CN) 2106010.


The purpose of the study is to identify and recommend alternatives that will improve safety and connectivity for all user types of the transportation system. A combination of multimodal users, strong heavy vehicle presence, and business and driveway access points along the corridors have led to both safety and congestion issues.

NMDOT Logo
FHWA Logo

Study Area

Map of the project study area.

Study Process and Timeline

The Carlsbad “Y” Phase I-A/I-B Study follows the NMDOT Location Study Procedures which are showcased below:

NMDOT Location Study Phases Diagram with Phase A and B highlighted

          Ultimately, the Study Process aims to:

  • Study issues in the area (safety, access, etc.)

  • Identify a purpose and need for project

  • Develop initial alternatives to address purpose and need

  • Engage stakeholders and the public

  • Create screening matrix and evaluate alternatives

  • Perform detailed engineering analysis and screening

Project timeline graphic

Engagement Opportunities

Check back regularly and sign up for project updates to find the latest ways to get involved!

Speaker Facing Audience

Coming Soon

Check back soon for additional details!

Community Meeting Vote

Coming Soon

Check back soon for additional details!

Speaker At Conference

Coming Soon

Check back soon for additional details!

Check back for proposed alternatives soon!

Proposed Alternatives

Contact Us

If you would like to get in touch with the study team or sign up for project updates, email us at Carlsbad-Y@bhinc.com or fill out the form below!

Study Team

Agency Team

NMDOT Logo
FHWA Logo
Bohannan Huston Inc. logo
Molzen Corbin & Associates logo
Epsilon Systems Solutions logo

Consultant Team

Geomat logo
Benesch logo
Bowman logo
bottom of page